Installation Guide

FlexCoat - Installation Instructions
FlexCoat - Installation Instructions
Coating Application Instructions
Before applying FlexCoat use masking tape to
cover areas you do not want the coating accidently
applied to (siding, vents, J-Channel, etc)
IMPORTANT NOTE: Do Not Apply FlexCoat
Foundation Coating in direct sunlight!
Stir well before using.
Pre-coat all mesh-taped areas with FlexCoat
coating using a putty knife. Clean the putty
knife after use.
Allow the precoated areas to completely set
(1-4 hours) before applying final coat of
FlexCoat coating. Premature application of
FlexCoat over precoated areas may result in
slight imperfections in the final appearance.
Apply the FlexCoat coating liberally with a
brush, using a semi-circular motion. Cover
only about a three-foot section at a time,
making sure the coating is uniform (about
1/16” thick). After coating an area, create the
texture you want immediately (do not texture
coating after it has begun to dry). Note: Clean
the brush periodically to avoid excessive
coating build-up
Continue this process, working on small areas
at a time, until the entire wall is covered.
Avoid stopping application in the middle of a
wall.
Replace dirt around foundation after allowing
48 hours for FlexCoat coating to dry.
Using a matching color caulk, seal all joints
where the foundation panels or J-Channels
meet the siding and all around any windows,
doors, vents, etc.
For added durabilty a second coat may be
applied 24 hours after the initial coating.
After coating has cured (at least 48 hours) it
may be painted (Styro Lastic is an excellent
choice)
www.styro.net
1-888-702-9920
Fastener Chart:
1” - To attach J-Channel to foundation wall
2” - To attach insulation panels up to 1” thick
3” - To attach panels from 1.5”-2” (or 1” panels on uneven surface)
4” - To attach panels from 2.5”-3” (or 1”-2” panels on uneven surface)
Page 1 On Other Side
888-702-9920
www.styro.net
888-702-9920
www.styro.net