Installation Guide
5
Before proceeding to lay the tiles,
prepare the substrate by making a
cement screed using sand and ce-
ment or specic pre-mixed products.
Make sure that the prepared subs-
trate is clean, dry and at (with no
unevenness of over 3mm, measured
using a 2m straightedge). The subs-
trate must be rigid and stable with
no cracks. When the tiles are being
laid, check for any possible defects in
the atness of the substrate before
the tile adhesive dries completely.
Always follow the instructions given
by the manufacturers of the adhe-
sives and materials used to prepare
the substrate.
Guide to Ceramic
Tile-Laying & Care