Installation Guide

5
Before proceeding to lay the tiles,
prepare the substrate by making a
cement screed using sand and ce-
ment or specic pre-mixed products.
Make sure that the prepared subs-
trate is clean, dry and at (with no
unevenness of over 3mm, measured
using a 2m straightedge). The subs-
trate must be rigid and stable with
no cracks. When the tiles are being
laid, check for any possible defects in
the atness of the substrate before
the tile adhesive dries completely.
Always follow the instructions given
by the manufacturers of the adhe-
sives and materials used to prepare
the substrate.
Guide to Ceramic
Tile-Laying & Care