Installation Guide

ASSEMBLY INSTRUCTIONS
Hardware Used
Hardware Used
1
2
3
4
Crossbar
x 1
x 3
x 2
4. Attach wire nuts (BB). Tape wire nuts (BB)
and wires together.
Wire nut
Cap nut
B
DD
B
B
BB
AA
BB
ASSEMBLY INSTRUCTIONS
5
6
6. Install bulbs (EE).
2. Based on desired length, install stems (B)
together. Then install one end of stem
assembly to î‚¿xture (C) and the other
end to ceiling plate (A).
3. Strip 3/4 in. of insulation from wire ends.
Twist stripped ends together with pliers (not
included), black to the wire with smooth surface
(power) and white to the wire with longitudinal
ridges (neutral). Attach copper wire to ground
wire. Helpful hint: If necessary, attach copper
ground wire to grounded junction box.
4 5
5. Attach ceiling plate (A) to crossbar (DD).
Secure with cap nuts (AA).
Lowes.comLowes.com
AA
CC
DD
Hardware Used
Cap nut
Machine screw
Crossbar
x 2
x 2
x 1
1. Remove cap nuts (AA) from the preassembled
mounting screws on crossbar (DD). Attach
crossbar (DD) to the outlet box (not included) with
machine screws (CC). Note: The mounting screws
should protrude away from the outlet box.
B
AA
B
CC
B
DD
B
A
C
AA
A
DD
EE