Installation Guide

2
2020_STYS_LOW_INST
Site and Material Preparation
A) Remove carpet and padding. Also remove any wood flooring installed on concrete. Do not remove products
unless they are asbestos-free.
B) Undercut door frame and wallbase. Slide the flooring at least 1/4" underneath the door frame and wallbase.
Also leave a concealed 3/8" minimum expansion space under each.
C) Remove bumps or peaks in subfloor and fill depressions with floor leveling compound to ensure no more than
3/16" unevenness per 10-foot span.
D) Acclimate unopened product before installation. If there is no time for acclimation, there should be no more than
a difference of 25° F and 20% relative humidity between the stocking/transportation environment of the flooring
and the final installation environment of the flooring.
E) Clean debris from subfloor before installation.
F) For planks without attached underlayment, first install Pergo Gold™ Premium Underlayment (Lowes Part # 670312)
over concrete or wood subfloors per the installation instructions included in the Pergo Gold package.
Alternative underlayment
G) For concrete subfloors, first install vapor barrier with overlapped seams of 8" or more.
H) For planks without attached underlayment, install over a single layer of underlayment appropriate for
laminate floors.
Style Selections
Laminate Flooring Installation Instructions
A
Door
Frame
Marco de la
puerta
Cutting Line
Línea de corte
Wallbase
Zócalo
Casing
Contramarco
1 inch
(2.5cm)
B
H
E
suboor
subsuelo
6 mil (0.15 mm) virgin
polyethelene vapor barrier
Barrera contra vapor de polietileno
virgen de 0,15 mm
> 8" (200 mm)
G
F
C
%
48 hours
48 horas
60° – 85° F
15° á 29° C
35% – 65% RH
35 % a 65 % de HR
D