Installation Guide
3
HARDWARE CONTENTS (shown actual size)
AA BB
Outlet Box
Screw
Bulb
Qty. 2
CC
Green Ground Screw
(preassembled to
Crossbar (EE))
Qty. 1
DD
GG
FF
HH
Wire
Connector
Qty. 3
(preassembled to
Fixture Body (A))
(preassembled to
Fixture Body (A))
(preassembled to
Fixture Body (A))
Socket Ring
Mounting Screw
Qty.3
Glass Holder
Qty. 3
Qty. 2
Qty. 3
Crossbar
(Not shown to size)
Qty. 1
(Not shown to size)
(preassembled to
Fixture Body (A))
Qty. 1
EE
II
Socket Ring Tool
SAFETY INFORMATION
Please read and understand this entire manual before attempting to assemble, operate or install the
product.
WARNING
• RISK OF ELECTRIC SHOCK - Before beginning installation, turn off electricity at the
circuit breaker box or the main fuse box.
• RISK OF FIRE - Use bulbs
by the markings and/or labels on the
• This product must be installed in accordance with the applicable installation code by a person
familiar with the construction and operation of the product and the hazards involved.
CAUTION
• For your safety, read instructions completely before beginning installation.
• If in doubt about electrical installation, consult a licensed electrician.
• Turn off electricity to
before replacing the bulb(s).
PREPARATION
Estimated Assembly Time: 10 - 15 minutes
Tools Required For Assembly (not included): Flathead screwdriver, Phillips screwdriver, Pliers,
Electrical tape, Wire cutters
Helpful Tools (not included): Wire strippers
Lowes.com
Before beginning assembly of product, make sure all parts are present. Compare parts with
crossbar contents list and diagram above. If any part is missing or damaged, do not attempt to
assemble the product.