StyleCrest Installation Manual

12
SCREWS
COMPLETED
ASSEMBLY
TO FURNACE
UPPER ROOF
JACK (CROWN)
INNER FLUE PIPE
FLUE ASSEMBLY
OUTER PIPE
FLASHING
WEATHER CAP
Figure 23. Roof Jack Crown
ELECTRICAL INFORMATION
WARNING:
ELECTRICAL SHOCK, FIRE OR
EXPLOSION HAZARD
Failure to follow safety warnings exactly could
result in serious injury or property damage.
Improper servicing could result in dangerous
operation, serious injury, death or property
damage.
Before servicing, disconnect all electrical
power to furnace.
When servicing controls, label all wires prior
to disconnecting. Reconnect wires correctly.
Verify proper operation after servicing.
AVERTISSEMENT :
RISQUE DE DÉCHARGE ÉLECTRIQUE,
D’INCENDIE OU D’EXPLOSION
Le non-respect des avertissements de sécurité pourrait
entraîner des blessures graves ou des dommages
matériels importants.
Un entretien inapproprié peut provoquer un fonctionnement
dangereux, des blessures graves, la mort ou des
dommages matériels.
Avant toute intervention, coupez l’alimentation
électrique de la fournaise.
Pour l’entretien des commandes, étiquetez tous les
fils avant de les débrancher. Rebranchez les fils
correctement.
Vérifiez le bon fonctionnement après l’intervention.
Line Voltage Wiring
WARNING:
To avoid electric shock, personal injury, or death,
turn off the electric power at the disconnect or the
main service panel before making any electrical
connections.
Electrical connections must be in compliance with all
applicable local codes with the current revision of the
National Electric Code (ANSI/NFPA 70).
For Canadian installations the electrical connections
and grounding shall comply with the current Canadian
Electrical Code (CSA C22.1 and/or local codes).
It is recommended that 115VAC line voltage be supplied
to the furnace from a dedicated branch circuit containing
the correct fuse or circuit breaker for the furnace as listed
in Table 5, (page 13).
Removing the Transit-Mode Venting System
(After home is moved to site)
WARNING:
Failure to properly secure the flue pipe to
the furnace may result in fire, explosion or
asphyxiation when operating the furnace.
1. Transit-mode weather cap to be removed and upper
roof jack crown installed. Do not discard the screws.
See Figure 23.
2. Place upper roof jack (crown) on the flue pipe assembly.
NOTE: Make sure inside flue pipe attaches over inner
flue pipe and outer Roof Jack pipe fits over outer pipe.
3. Secure in place using three sheet metal screws (#10
x 1/2”) removed in step 1. Do not use the same holes
which secured the rain cap in place.
4. Remove and discard all 4 venting system warning tags.