Product Manual

Page 7 of 16
1. Put the base of the HANDLE TUBE (Fig. 1) on the PRESSURE FRAME (Fig. 1). Align the holes
(Fig. 1) at the base of the HANDLE with the holes in the PRESSURE FRAME. The chain should
drop through the middle hole of SHAFT (Fig. 2).
(Fig. 1)
2. Using a screwdriver, pry the LEVER PLATE (Fig. 2) up and slip the bolt head under the notch in the
LEVER PLATE.
(Fig. 2)
3. Secure the HANDLE to the pallet jack with the three SPRING WASHERS and SCREWS (Fig. 1).
Note: It is a good idea to remove any air bubbles that might have accumulated in the hydraulic
system during shipping. Refer to Bleeding the Air in the Maintenance section.