Installation Guide
Table Of Contents
streamlinebath.com
support@streamlinebath.com (310) 935-0028
k.
Position the leveling bar over the drilled holes.
l.
Secure the leveling bar in place using the M5x40mm screws. Use four
screws per leveling bar. Be careful not to overtighten the screws.
m.
Repeat for the other side.
Direct Tub-to-Floor Installation
If opting NOT to use the provided leveling foot hardware, the bathtub can be
set directly within the confines of the tub deck.
20










