Installation Guide
Table Of Contents
f. Follow the same procedure for the remaining leveling feet.
g. Position both fully assembled leveling bars onto the bathtub's underside,
ensuring that the bars are placed evenly. We strongly recommend referring
to the item's speciļ¬cation sheet for precise positioning of the leveling bars
for comprehensive measurements.
h.
Mark
the positions of the four holes on the underside of the bathtub
where the leveling bar will be positioned. Repeat this step for the other
side as well.
i. Remove the leveling bars.
j. Using a 3/16'' (5mm) drill bit, carefully drill pilot holes into the bathtub's
surface, ensuring that the drilling depth does not exceed a maximum of
0.6'' or 15
mm into the bathtub.
streamlinebath.com
support@streamlinebath.com (310) 935-0028
19










