User's Manual
5-6 KleeYa - User Manual - Version 2
MAINTENANCE AND SERVICE
MAINTENANCE AND CLEANING
Figure 5-1: Wash buffer/system liquid containers
5. Put the cap (1) on the additional intermediate container and tighten it loosely.
6. Prime the washers (cleaning):
a. Start the maintenance task "Prime Washer".
b. Wait 5 minutes after finishing the task.
c. Repeat the cleaning procedure 4 times in total.
7. Open the cap (3) of the intermediate system liquid container (4) behind the
system liquid container. Make sure that the inner part of the cap (3) with the
connections does not rotate with the outer part.
8. Place the cap (3) in a suitable clean and empty container.
9. Open the cap (1) of the additional intermediate wash buffer container.
10. Put the cap (1) on the intermediate system liquid container (4) and tighten it
loosely.
11. Prime the washers (flushing):
a. Start the maintenance task "Prime Washer".
b. Wait 1 minutes after finishing the task.
c. Repeat the cleaning procedure 8 times in total.
12. Open the cap (1) of the intermediate system liquid container (4).
13. Put the cap (1) on the intermediate wash buffer container (2) and tighten it by
hand.
14. Put the cap (3) on the intermediate system liquid container (4) and tighten it
by hand.
15. Start the maintenance task "Prime Washer" to fill the washers with wash
buffer.