Full Product Manual

STEP 1 A INLINE POST INSTALLATION
Set out posts and allow 8 feet* from center to center,
making sure that all posts are plumb in all directions.
*When using 7’ 11” (2415mm) wide slat packs
Installation tip: Panel width may be adjusted by cutting
slats using appropriate aluminium cutting blade.
FORMULA:
Adjusted slat width = Center to center of post MINUS 1” (25mm)
STEP 2
If setting the posts in the ground, place posts
approximately a depth of 2 feet
(Height of post can be
cut to desired height using appropriate cutting blade)
.
Adjust the post insert to the height that you want the
first slat to be o the ground before filling the post hole.
STEP 1 B CORNER POST INSTALLATION
For corner post with side frame attached, allow 8 feet 1 ⅜
inches center to center.
*When using 7’ 11” (2415mm) wide slat packs
Installation tip: Panel width may be adjusted by cutting
slats using appropriate aluminium cutting blade.
FORMULA:
Adjusted slat width = Center to center of post MINUS 2 ⁄” (58mm)
STEP 3
For the corner post, it is necessary to attach the side
frame as shown. First, remove the end caps, followed by
the inner u channel then attach the outer u channel to
the post with the 3 wafer head screws supplied (ax at
top, middle and bottom of channel).
TOOLS REQUIRED FOR INSTALLATION
 METAL TAPE MEASURE
 SPIRIT LEVEL
 PHILLIPS HEAD SCREWDRIVER BIT FOR DRILL
 CARPENTERS PENCIL
 POWER AND/OR CORDLESS DRILL
 TIMBER, MASONRY OR STEEL DRILL BITS AS NEEDED
 DROP SAW WITH SUITABLE BLADE FOR CUTTING
ALUMINIUM IF ADJUSTING HEIGHT OR WIDTH
8 FT BETWEEN CTRS 8 FT BETWEEN CTRS
8 FT 1 INCHES
POST
INSERT
x3
1 WAY, 2 WAY & CORNER POST
SYSTEM ASSEMBLY GUIDE