Full Product Manual
Table Of Contents
On a flat protected surface, lay 1x gate side frame
with slotted spacer infill and rest against a padded
stop and tap slats into place.
Elevate the slats & gate side frame on two padded
bearers to allow the second gate side frame to be
attached.
Engage the second gate side frame to the slats and
tap the frame until all the slats are fully engaged.
TIP: Start at one end and work slats in from one end
to the other.
GATE SLAT POSITIONING
2x at top of gate
1x at middle of gate
1x at bottom of gate
NOTE: 4x gate slats must be used even when gate height is reduced
Check measure diagonals to ensure the gate is square.
Screw all gate slats (4 screws per slat).
NOTE: Set cordless drill to “screw function” to avoid breaking screw heads.
Slide in the 2x outer infills into position to hide
screw heads.
3
4
!
5
6
7
PEDESTRIAN GATE
ASSEMBLY GUIDE