Operating Manual
• Any special equipment required for installation (crane, lifts,
etc.): ___________________________________________
• Required Building permits/codes:
________________________________________________
________________________________________________
e. Place on tall tower.
• Determine tower height to clear obstruction _____.
• Place far away from trees, building and other obstructions.
• Determine if ground foundation is suitable
• Place guy wires for stability if required.
• Any special equipment required for installation (crane, lifts,
etc.): ___________________________________________
• Existing lightning arrestment system (LARS) for lightning
suppression.
• Required Building permits/codes:
________________________________________________
________________________________________________
f. Special environment concerns (extreme temperatures, high wind
and lightning area):
______________________________________________________
g. Site Access limitations (location, security, etc.)
______________________________________________________
______________________________________________________
______________________________________________________
h. Coordinate location with existing StormQuant radar coverage.
2. Power availability – 110 VAC required
a. Power Source: _________________
b. Peak Output Capacity (KVA): ____________
c. Uninterruptable Power Supply: ______________
d. Emergency Generator (must match site requirements):
______________________________________________________
3. Network availability (for retrieving radar data and remote administration
access).
a. Ethernet: Wired ___ Wi-Fi ___
b. Designated IP Address: _________________
c. Expected data rate upload : ____ Mb/s
d. Network provider: __________________