Installation Guide
Table Of Contents
- Slide 1: ASSEMBLY & INSTALLATION INSTRUCTIONS
- Slide 2: Before getting started, let’s make sure this Storm Shell will work for you!
- Slide 3: Before getting started, let’s make sure this Storm Shell will work for you!
- Slide 4
- Slide 5
- Slide 6
- Slide 7
- Slide 8
- Slide 9
- Slide 10
- Slide 11
- Slide 12
- Slide 13
- Slide 14
- Slide 15
- Slide 16
- Slide 17
- Slide 18
- Slide 19
- Slide 20
- Slide 21
- Slide 22
- Slide 23
- Slide 24
- Slide 25
- Slide 26
- Slide 27
- Slide 28
- Slide 29
- Slide 30
- Slide 31
- Slide 32
- Slide 33
- Slide 34
Step 2C – Hollow Wall Installation
25
2C-1 C90 (Cinder Block) Wall, or Masonry Wall Less Than 8” Thick
2C-2 Metal Stud Installation
• If the C90 wall is filled with concrete, follow Step 2B
• If the C90 wall is hollow, follow Step 2B except use Toggle Bolts
(1/4” or 5/16”) in place of I5 to attach the TV Bracket. Use four
Toggle Bolts to attach the TV Bracket.
• Toggle Bolts or Strap Toggles are available at hardware stores or
online.
Toggle Bolt
Strap Toggle Bolt
Toggle Bolt
Strap Toggle Bolt
• Follow Step 2A except use Toggle Bolts (1/4” or 5/16”) in place
of G5 to attach the TV Bracket. Use four Toggle Bolts to attach
the TV Bracket.
• Toggle Bolts or Strap Toggles are available at hardware stores or
online.