Operation Manual

75MS 241 C
Check leads between control unit
and diagnostic jack
Connect the test lead, b 16
: Measure the resistance between
blade receptacle (1) with red lead
and black plug (2) of the
diagnostic cable
Target value: < 10 ohms.
: Measure the resistance between
blade receptacle (1) with black
lead and red plug (2) of the
diagnostic cable
Target value: < 10 ohms.
If the target values are not
attained
Check contact between blade
receptacle of the switch shaft and
contact spring
2410RA233 TG
1
2
2410RA234 TG
1
2
Check continuity between leads
and blade receptacles
– Blade receptacles must be
firmly connected to the leads; in
the event of contact problems,
the wiring harness must be
replaced, b 8.2.3, b 8.2.6
Check leads between solenoid
valve and diagnostic jack
Connect the test lead, b 8.2.2
Versions with manual fuel pump,
remove fuel pump and set it
aside, b 8.2.3
: Disconnect the plug (1) from the
solenoid valve (2) – the solenoid
valve must not be twisted; if
necessary, hold the solenoid
valve in place when
disconnecting the plug
: Measure the resistance between
red lead (1) at the plug of the
solenoid and black plug (2) of the
diagnostic cable
2
2410RA229 TG
1
2410RA235 TG
1 2
Target value: < 10 ohms
: Measure the resistance between
black lead (1) at the plug of the
solenoid and red plug (2) of the
diagnostic cable
Target value: < 10 ohms
If the target values are not
attained
Check contact surfaces on plug
of the plug connection, as well as
checking electrical leads for
interruption, e. g., cable
breakage
If the contact surfaces on the plug
are damaged in the plug
connection between wiring
harness and switchgear, the
wiring harness must be replaced,
b 7.7.2, if the contacts in the
jack are damaged, the
switchgear must be replaced,
b 8.4
Reassemble remaining parts in
reverse order
2410RA236 TG
1
2