Operation Manual

131MS 241 C
All versions
Washer (1) must be fitted.
Ring (1) must be in place.
Sealing ring (2) must be in place.
Connector (3) must engage in the
hole of the manifold flange.
Install the switchgear wiring
harness on the carburetor, b 8.4
: Slide on the carburetor (1) over
the studs (arrows) until it is flush
with the studs
2410RA495 TG
1
2410RA492 TG
1
2
3
2410RA496 TG
1
: Push new fuel hose (1) onto the
connector (2) so that the
tab (arrow) faces the throttle
shaft lever and fits against the
connector evenly
Version with heating
Press the plug connection
together completely, b 1
: The lead (1) of the thermostatic
switch must be seated in the
guides (arrows) and run behind
the stud (2)
: Push insulating tube (1) onto
lead (2) of the thermostatic
switch
2410RA497 TG
1
2
2410RA498 TG
1
2
2410RA499 TG
1
3
4
2
: Push together the connector (3)
and the terminal socket (4)
: Slide the insulating tube (1) over
the plug connection, if necessary,
with gentle twisting motions
: Press the plug connection with
insulating tube (1) into the center
of the guide (arrow)
The lead (1) of the thermostatic
switch must run along the loop (2)
above the generator lead.
: Press lead (1) completely into the
guide (arrow)
2410RA416 TG
1
2410RA503 TG
2
1