Operation Manual

104 MS 241 C
: Run the thin lead (1) with a
loop (2) around the rib and press
it into the guide (arrow) as far as
it will go
: Orient cover (1) so that the
pegs (2) engage the holes and
the tab (3) engages the
fin (arrows)
Replace cover, insert and tighten
screw
– Ensure that wires are not
pinched
2410RA339 TG
1
2
3
1
2
2
2410RA340 TG
The leads of the handle heating
element must be seated completely
in the guide (arrow).
Install throttle trigger, b 11.2
: Hook throttle rod (1) onto throttle
trigger (2) and press it into the
guide (arrow)
Install trigger interlock and
handle molding, b 11.2
2410RA341 TG2310RA167 TG
2
1
: Push tank housing (1) upward
and hold it there
: Screw in the screw (2) and
tighten it
Reassemble remaining parts in
reverse order
2310RA253 TG
2
1