Operation Manual
100 MS 241 C
Installation
– Position front handle
: Lift front handle (1) with the
peg (2) facing forward into the
recess (arrow) until it is seated in
the mount of the tank housing
– Insert and tighten down
the screws
: Lift the front handle (1) somewhat
at the side and place it in the
guide (arrow) so that the peg (2)
engages in the mount of the
crankcase
– Insert and tighten down the
screws
2
2310RA158 TG
1
2410RA317 TG
1
2
: Position bearing plug (1) of the
antivibration spring against
cylinder
: Coat screw (2) with Loctite,
screw in and tighten, b 16
– Reassemble remaining parts in
reverse order
10.4.1 Handlebar with heating
As the front handle is heated in
these machines, the wiring must
also be disconnected for
installation.
– Troubleshooting, b 14.7.1
– Remove shroud, b 6.4
– Remove handle molding, trigger
interlock and throttle trigger,
b 11.2
: Pull throttle rod (1) out of the
mount (arrow) and unhook it from
the throttle trigger (2)
2410RA306 TG
1
2
2310RA167 TG
2
1
: Remove screw (1) on front
handle
: Remove screws (1) on front
handle (2) on the underside of
the machine
: Remove screw (1)
2410RA303 TG
1
2310RA157 TG
1 1 2
2410RA557 TG
1