Operation Manual

100 MS 241 C
Installation
Position front handle
: Lift front handle (1) with the
peg (2) facing forward into the
recess (arrow) until it is seated in
the mount of the tank housing
Insert and tighten down
the screws
: Lift the front handle (1) somewhat
at the side and place it in the
guide (arrow) so that the peg (2)
engages in the mount of the
crankcase
Insert and tighten down the
screws
2
2310RA158 TG
1
2410RA317 TG
1
2
: Position bearing plug (1) of the
antivibration spring against
cylinder
: Coat screw (2) with Loctite,
screw in and tighten, b 16
Reassemble remaining parts in
reverse order
10.4.1 Handlebar with heating
As the front handle is heated in
these machines, the wiring must
also be disconnected for
installation.
Troubleshooting, b 14.7.1
Remove shroud, b 6.4
Remove handle molding, trigger
interlock and throttle trigger,
b 11.2
: Pull throttle rod (1) out of the
mount (arrow) and unhook it from
the throttle trigger (2)
2410RA306 TG
1
2
2310RA167 TG
2
1
: Remove screw (1) on front
handle
: Remove screws (1) on front
handle (2) on the underside of
the machine
: Remove screw (1)
2410RA303 TG
1
2310RA157 TG
1 1 2
2410RA557 TG
1