User Manual
Table Of Contents
- 1. Table of contents
- 2. Notes on the instruction manual
- 3. Machine overview
- 4. For your safety
- 5. Description of symbols
- 6. Standard equipment
- 7. Preparing the machine for operation
- 8. Notes on working with the machine
- 9. Safety devices
- 10. Operating the machine
- 10.1 Electrical connection of garden shredders
- 10.2 Connecting the power cable
- 10.3 Disconnecting the power cable
- 10.4 Strain relief
- 10.5 Inserting the shredder bag
- 10.6 Removing the shredder bag
- 10.7 Switching on the garden shredder
- 10.8 Switching off the garden shredder
- 10.9 Recommencing operation following a blockage
- 10.10 Shredding
- 10.11 Folding in the machine GHE 140 L
- 10.12 Folding out the machine GHE 140 L
- 11. Maintenance
- 12. Transport
- 13. Minimising wear and preventing damage
- 14. Environmental protection
- 15. Technical specifications
- 16. Troubleshooting
- 17. Service schedule
EN
13
0478 201 8312 A - EN
7.1 Installing the wheels and feet
GHE 140 L:
– Fold out the machine. (Ö 10.12)
Installing the wheels:
GHE 135 L, GHE 140 L:
– Remove the shredder bag. (Ö 10.6)
● Lever wheel cap (1) from wheel (I)
using a screwdriver.
● Insert bolt (J) with washer (L) from the
inside through the bore in wheel
carrier (B). Push washer (L) and
sleeve (K) onto bolt (J). Push wheel (I)
onto sleeve (K). Fit nut (M) with
washer (L) and tighten to 5-7 Nm.
● Centre wheel cap (1) on wheel (I) and
press in until wheel cap (1) engages.
– Repeat this procedure on the other
side.
Installing the feet:
● Insert the bolt of foot (F) through the
bore in wheel carrier (B) from below. Fit
washer (G) on the bolt, screw on
nut (H) and tighten to 4-6 Nm.
– Repeat this procedure on the other
side.
7. Preparing the machine for
operation