Instruction Manual
Header
»
Tiled roof installation:
Installation measurements for the
heatpipe collector
76.75 inches
Footer
25.25 inches — 37.75 inches
38.75 inches — 55.5 inches
25.25 inches — 37.75 inches
38.75 inches — 55.5 inches
11
Installation instructions • SP-20 • SP-30
Stiebel Eltron, Inc. 17 West Street West Hatfield, MA 01088
Telephone: 800.582.8423 | Fax: 413.247.3369 | info@stiebel-eltron-usa.com | www.stiebel-eltron-usa.com
Simply the Best
S-Power SP-20S-Power SP-20
S-Power SP-30S-Power SP-30
S-Power SP-20S-Power SP-20
S-Power SP-30S-Power SP-30