Instruction Manual

Wall/facade, flat roof and corrugated metal installation
(roof and wall)
Set the cap prole in the façade or elevated track.
For wall/façade installation, the cap prole is to be vertically mounted.
i
» Corrugated metal installation (roof + wall):
Screw the cap prole onto the trapezoid in using self-cutting drill screws (sealing: Silicone among
others). Collector installation same as all other types of fastenings.
1
2
3 a
3
Install on wall or façade
Install on corrugated metal
Mark , drill, insert wall plug , install cap prole
with key screw NW 13 nm , mount with suitable
screws for corrugated metal and at roof installation,
Slide reectors-if available-onto the cap prole and
secure with nuts M8.
1
2
3
3 a
10
Cap prole
25.25 inches — 37.75 inches
38.75 inches — 55.5 inches
76.75 inches
Installation instructions
SP-20 SP-30
Stiebel Eltron, Inc. 17 West Street West Hatfield, MA 01088
Telephone: 800.582.8423 | Fax: 413.247.3369 | info@stiebel-eltron-usa.com | www.stiebel-eltron-usa.com
S-Power SP-20S-Power SP-20
S-Power SP-30S-Power SP-30