User Manual
English
WWW.STIEBEL-ELTRON.COM PSH UNIVERSAL EL| 29
INSTALLATION
COMMISSIONING
11. Commissioning
11.1 Commissioning
Open the shut-off valve in the cold water line.
Open a draw-off point until the appliance has filled up and
the pipework is free of air.
Observe the maximum permissible flow rate with a fully
opened tap (see chapter "Specification / Data table").
Switch the mains power ON. The appliance carries out a
self-test.
Check the function of the appliance.
Check the function of the safety valve.
11.1.1 Appliance handover
Explain the appliance function to users and familiarise them
with its operation.
Show the user the safety valve and its operating instructions,
and explain its significance.
Make the user aware of potential dangers, especially the risk
of scalding.
Hand over these instructions.
11.2 Returning into use
See chapter "Commissioning".
12. Settings
12.1 Switching on commercial mode
26�02�07�0296
S Jumper ECO (energy saving mode)
E ECO ON (factory setting)
A ECO OFF (commercial mode)
To switch on commercial mode, replug the jumper.
12.2 Switching on reverse control
26�02�07�0296
R Reverse control jumper
E Reverse control ON
A Reverse control OFF (factory setting)
To switch on reverse control, replug the jumper.
13. Taking the appliance out of use
Disconnect the appliance from the mains at the MCB/fuse in
the fuse box.
Drain the appliance. See chapter "Maintenance / Draining the
appliance".