Instructions / Assembly
Step 4. CONCRETE Wall Preparation
IF INSTALLING INTO DRYWALL – PLEASE PROCEED TO STEP 7.
Position the rail by measuring up from the door 
height (H) + 1 3/4" to the centre of the track. Also ensure  
a gap of 3/8" - 1/2" at the bottom. Ensure the rail is level and  
leave a minimum of 2" from the end of the rail to the side 
of the opening (as shown). 
If installing with an opening for 80" standard door size, 
remove the top trim and cut the side trim horizontally along 
the height of the opening.
renincorp.com • acmesystemsandhardware.com
BARN DOOR HARDWARE KIT 
BD102K-07800
ASSEMBLY INSTRUCTIONS
Step 5. CONCRETE Wall Preparation
Position the rail in place ensuring that it is level, mark the 
holes on the rail using a pencil and pre-drill 5/16" holes  
into the concrete.
Step 6. CONCRETE Rail Installation 
When installing directly into concrete, insert using the 
provided anchors and carriage bolts (with washers). 
Ensure to un-screw to separate the carriage bolt and  
anchor to install correctly, securing with a wrench.
Ensure to insert both stoppers either side of the rail inside 
the rst hole.
Door Height + 1 3/4
"
3/8" (9.5mm) –
1/2" (12.7mm)
Gap under
the door
78 3/4" (2000mm)
Minimum
2"
(51mm)
1 3/8" (30mm)
5/16" (8mm)






