User Guide
Out let flap
Re move the con nect ing plug “flap switch” (A) from the con nec tion hous ing of the
hop per.
Re move the ten sion ring (B) and the seal ing ring on the hop per loader.
Re move the up per part of the hop per loader (C) from the lower part of the hop per
loader (D).
Draw the old seal ing ring (E) off the noz zle of the ma te rial out let.
In stall the new seal ing ring (E).
F
Ob serve the di rec tion of in stal la tion (F).
516-3MS
SSK-5
Main te nance 21
180 °
In stal la tion seal ing ring
A B C D E F










