User Guide

SSE 2
8-4 Maintenance
8.2. Servicing the Loader
M Disconnect the unit from main power supply by unplugging it.
Depressurize all system sections of the equipment (only units with active
cleaning).
8.2.1. Changing the sealing ring of the outlet flap
1. Open the toggle-type fasteners (A)
and the flap (B) of the hopper loader.
2. Draw the old sealing ring (C) off the
nozzle of the material outlet.
3. Install the new sealing ring (C).
F Make sure the new sealing ring (C)
in installed properly. Do not install
the sealing ring upside-down.
4. Close the flap (B) and the toggle-type fasteners (A).
& Order number sealing ring “material outlet”: ID 29258
Figure 10: Installation sealing ring