User Guide
SSE 2
4-6 Assembly instructions
4.4.1. Mounting on the processing machine
A material hopper VT 1.0 is required:
1. Mount the material hopper onto the
flange of the processing machine.
2. Mount the unit onto the material
hopper.
F Observe the bearing capacity of the machine flange.
4.4.2. Mounting onto a machine hopper
A welding flange EF 190 is required:
L Please observe all safety regulations
for the operation of welding
equipments.
Always wear safety goggles.
1. Weld the welding flange into the machine hopper lid.
2. Mount the unit onto the flange.
Figure 5: VT 1.0
Figure 6: EF 190










