Instale las tuberías de plomería (cont.)
Con una abrazadera para tubo, sujete las líneas de suministro a la estructura de
postes de madera.
Instale las válvulas conforme a las instrucciones del fabricante. No instale la
guarnición en este momento.
4. Position the Bath
NOTICE: Do not lift the or move the bath by the apron or apron braces. To avoid
damage to the bath, lift at the sides of the bath.
NOTICE: Do not support the load weight of the bath by the perimeter of the rim.
The rim perimeter must be adequately supported, but must not support the load
weight of the bath.
NOTE: Keep a liner or drop cloth in place in the bottom of the bath until
construction is complete.
Install the drain and overflow assembly to the bath according to the drain
manufacturer’s instructions.
NOTICE: Squeaking may develop if the bath is installed over a subfloor other than
plywood. In order to prevent squeaking, place a pad between the bath and the
subfloor and positioned under the bath supports. We recommend that the pad be
made of spun bonded polypropylene landscape fabric or spun bonded house wrap
material. Do not use roofing felt.
NOTICE: Do not remove the clips that are attached to the bath. The clips are
required to ensure proper installation of the walls.
Verify that the bath is level.
Vérifier que la baignoire est nivelée.
Verifique que la bañera esté a nivel.
Shim if necessary.
Caler si nécessaire.
Utilice cuñas si es necesario.
Studs
Montants
Postes de madera