SPV Remote Proportioning Valve Part Number: 882.00268.00 Bulletin Number: SM4-640.1 Effective: 4/17/08 Write Down Your Serial Numbers Here For Future Reference: _________________________ _________________________ _________________________ _________________________ _________________________ _________________________ We are committed to a continuing program of product improvement. Specifications, appearance, and dimensions described in this manual are subject to change without notice. DCN No.
Shipping Info Unpacking and Inspection You should inspect your Remote Proportioning Valve for possible shipping damage. Thoroughly check the equipment for any damage that might have occurred in transit, such as broken or loose wiring and components, loose hardware and mounting screws, etc. In the Event of Shipping Damage According to the contract terms and conditions of the Carrier, the responsibility of the Shipper ends at the time and place of shipment.
Table of Contents CHAPTER 1: SAFETY................................................................ 5 1-1 How to Use This Manual ............................................................................................. 5 Safety Symbols Used in this Manual .....................................................................5 Responsibility ........................................................................................................5 Warnings/Precautions ......................................
CHAPTER 6: APPENDIX.......................................................... 24 6-1 6-2 6-3 6-4 Customer Satisfaction Warranty Program................................................................. 24 Technical Specifications............................................................................................ 24 Electrical Requirements ......................................................................................24 Compressed Air Consumption..............................................
Chapter 1: Safety 1-1 How to Use This Manual This manual covers only light corrective maintenance. No other maintenance should be undertaken without first contacting a service engineer. The Functional Description section outlines models covered, standard features, and safety features. Additional sections within the manual provide instructions for installation, specifications, and operation. The Installation chapter includes required data for receiving, unpacking, inspecting, and setup of your product.
1-3 Warnings and Precautions STERLING water management systems products are designed to provide safe and reliable operation when installed and operated within design specifications, following national and local safety codes. To avoid possible personnel injury or equipment damage when installing, operating, or maintaining this equipment, use good judgment and follow these safe practices: ; Follow all SAFETY CODES. ; Wear SAFETY GLASSES and WORK GLOVES.
Chapter 2: Functional Description 2-1 Models Covered in This Manual This manual offers a general reference for the installation and operation of the Remote Proportioning Valve (SPV) with control configurations A, B, C, and D. Material inlets and outlet sizes range from 1.5” to 2.5”. 2-2 General Description The Remote Proportioning Valve is an efficient and economical means to proportion two different free-flowing granulated materials in a material conveying system.
2-4 Typical Features and Components The SPV is available with a variety of control choices designed to suit your particular operation. SPV-A The A model Remote Proportioning Valve is designed exclusively for use with the Autoload Hopper Loader. SPV- B and D The B and D model SPV’s are designed for use with central vacuum systems. These models will convert any existing vacuum hopper into a proportioning unit, regardless of manufacturer. The SPV – B uses 110 VAC supply voltage.
Chapter 3: Installation 3-1 Mounting the SPV The SPV can be mounted to a machine, on the floor, or on a wall. The optional floor stand provides installation location flexibility. The SPV can be used with more than one machine by switching hoses and positioning the floor mounted SPV in a convenient place. Wall Mount Installation This type of installation uses the optional wall mounting bracket to mount the Remote Proportioning Valve to a convenient wall, pipe, or other structural member.
Figure 1: Wall-Mount Configuration Remote Proportioning Valve Chapter 3: Installation 10 of 28
Floor-Mount Installation Use the following procedure to install the SPV using the floor stand: (See Figure 2 for more information.) 1. Assemble the stand by inserting the standard into the floor plate and tightening the set screw. 2. Complete the assembly by following steps 3 through 6 on page 9. 3. Position the floor stand so the clean-out and inspection hatches are accessible and the material hoses do not interfere with workspace or create a tripping hazard.
Machine-Mount Installation In this installation, the SPV is mounted directly to the material inlet of the hopper loader or vacuum hopper it will serve. The hopper loader or vacuum hopper inlet tube provides the support for the SPV. WARNING! Make sure that the hopper loader or vacuum hopper inlet can support the weight of the SPV (approximately 10 lbs.) and any unsupported material supply hose. A properly-installed hopper loader or vacuum hopper can support 250 lbs. of downward force.
3-2 Installing the SPV Controls DANGER! Disconnect and lock out power before working on equipment. Do not reconnect electric power until the installation is complete, the work has been checked, and all tools are removed, and all safety devices are activated. All electrical work must conform to all codes in effect at the installation site. Installing the SPV-A Autoload Knob Box Control If your SPV has the SPV-A control package, use the following procedure to install it: 1.
Figure 4: Knob Box Assembly Remote Proportioning Valve Chapter 3: Installation 14 of 28
Installing the SPV-B and SPV-D Standalone for Central Vacuum Systems This control configuration is used to convert a central system vacuum hopper into a proportioning vacuum hopper. The stand-alone control can be used in systems with 24 VDC or 110 VAC T-valve solenoids. The SPV-B requires an external 110/60/1 VAC power supply. The SPV-D requires a 220/5060/1 power supply and the proper plug and power cable (supplied by customer).
Figure 6: Standalone Junction Box Assembly Remote Proportioning Valve Chapter 3: Installation 16 of 28
Installing the SPV-C 9953 and 9963 Hopper Loader Control Use this control configuration to convert an existing 9953 or 9963 hopper loader into a proportioning hopper loader. The circuit board within these hopper loaders contains the circuitry necessary to control a Remote Proportioning Valve. Wire the solenoids in the Remote Proportioning Valve as shown in Figure 7. Use #18AWG wire for the solenoid connections. If your SPV has the SPV-C control package, use the following procedure to install it: 1.
Chapter 4: Operation The SPV can be controlled by one of three different controls. See Chapter 3: Installation for installation instructions. • Knob box — Used with Autoloader hopper loaders. This control is supplied with Model SPV-A. • Stand-Alone control — Used with central vacuum system vacuum hoppers. This control is supplied with models SPV-B and SPV-D. • Hopper loader control — Used with 9953 and 9963 hopper loaders.
4-2 Standalone Control Operation The Stand-Alone Control is provided with SPV models B and D and is used with central vacuum system operated vacuum hoppers. The Stand Alone control box has these features: Power Switch The power switch on the stand-alone box must be in the ON position during operation. If the power switch is turned off during operation, the SPV will stop conveying and the central vacuum system will sense a high vacuum condition and initiate a blowback cycle.
4-3 Hopper Loader Conversion Operation The SPV-C converts 9953 and 9963 hopper loaders into proportioning hopper loaders using the controls included with existing STERLING models. If you are familiar with the operation of 9955 and 9965 proportioning hopper loaders, the SPV-C is operated in the same manner. Adjust the potentiometers in the control enclosure as you would with a 9955 or 9965.
4-4 Weight Test for Accurate Proportioning To get an accurate proportion of regrind and virgin materials, run the test described below to determine the conveying rate of your particular installation using your materials. The test will determine the ratio settings needed to deliver the desired mix. 1. Determine the total throughput of the machine. This is equal to the amount (pounds) of material your processing machine uses in an hour. 2.
Chapter 5: Troubleshooting 5-1 Introduction The utmost in safety precautions should be observed at all times when working on or around the machine and the electrical components. All normal trouble-shooting must be accomplished with the power off, line fuses removed, and with the machine tagged as out of service. The use of good quality test equipment cannot be over-emphasized when troubleshooting is indicated.
Problem Possible cause Solution Control is on and working, but valve does not work. Faulty compressed air connection to valve. Repair connection/replace connector. Must have minimum 60 psi. Inadequate incoming vacuum signal and voltage. Locate problem, repair/ replace as needed. Loose connection wiring in control box. Repair/replace as needed. Improper shroud solenoid voltage compared to control output voltage. Compare voltage rating of solenoids in shroud to output voltage of controls.
Chapter 6: Appendix 6-1 Customer Satisfaction Warranty Program The manufacturer warrants all equipment manufactured by it to be free from defects in workmanship and material when used under recommended conditions. The Company’s obligation is limited to repair or replace FOB the factory any parts that are returned prepaid within one year of equipment shipment to the original purchaser, and which, in the Company’s opinion, are defective. Any replacement part assumes the unused portion of this warranty.
6-3 Drawings and Diagrams SPV Dimensions Remote Proportioning Valve Chapter 6: Appendix 25 of 28
SPV Assembly Drawing and Parts Breakdown Remote Proportioning Valve Chapter 6: Appendix 26 of 28
-Notes- Remote Proportioning Valve Chapter 6: Appendix 27 of 28
6-4 Technical Assistance Parts Department Call toll-free 7am–5pm CST [800] 423-3183 or call [262] 641-8610, fax [262] 641-8653 The ACS Customer Service Group will provide your company with genuine OEM quality parts manufactured to engineering design specifications, which will maximize your equipment’s performance and efficiency. To assist in expediting your phone or fax order, please have the model and serial number o your unit when you contact us.