User guide
AccuMeter Controller Chapter 17: Maintenance 95
Chapter 17: Maintenance
5-1 Preventative Maintenance Schedule
The mechanical design of the blender requires little maintenance. The only moving parts are the re-
fill valves, optional regrind agitators, metering augers, and optional discharge slide gates. The
checklist below contains a list of items which should be inspected and/or replaced to keep your
blender operating at peak efficiency. Perform each inspection at the regular intervals listed below.
Figure 52: Sample Preventative Maintenance Schedule
System model #
Serial #
Daily
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Visual Inspection of
equipment for basic
mechanical
problems
Every month
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Verify the blender
is properly
calibrated.
Check to make
sure that all hose
connections are air
tight.
Photocopy this page for your maintenance records