User guide

AccuMeter Controller Chapter 11: Configuring a new PLC 59
Chapter 11: Configuring a new PLC
This chapter should be used only if you are either upgrading a blender’s controls from a C2, Covis,
or OL controller. You can also use this chapter as a guide to configuring a new PLC. This chapter
does not cover the actual programming of a blank PLC (that is covered in Chapter 6).
This chapter details every parameter for an AccuMeter system, but assumes that both the Display
and PLC are programmed and communicating.
Step 1: Login to the Controller as the “SUPERVISOR”
From the main page touch “LOGIN” to bring up the login page
From the main page touch “LOGIN” to bring up the login page
Touch “User” and enter “SUPERVISOR” and hit enter.
Touch “Password” and enter “3145348” and hit enter
Touch the return arrow to complete the login process. You will not receive notification
for success or failure.