User manual

Table Of Contents
Additional symbols used in the MPPT 6000-M
I (IUIA charge)
C (Capacity test running)
L (Li-Ion charge mode)
A (NiCd charge mode)
Additional symbols used in the MPPT 6000-S
S (StecaLink slave mode active)
Time
Derating symbol. Active when the device automatically reduces
the output power due to overloading.
7.4 Display of special states
n When the inverter is processing large amounts of data it is not able to process any user input.
This is indicated by an animated sun symbol:
n The backlight blinks red when faults occur. An event message is also displayed. More
information on this is provided in
Ä
Chapter 10.2 ‘Event messages’ on page 111.
7.5 General operation
Paging through displays and menu levels
1. If necessary, press ESC for 1 s to show the basic setting of the
status display.
2.
Press D, Ñ to display the measurements.
3. Press SET. The main menu appears and the top entry is
selected.
4.
Press D, Ñ to select a different entry.
5. Press SET. The submenu appears.
6. Repeat steps 4 and 5 if necessary.
7. Press ESC briefly to jump one menu level higher or press ESC
for a longer time (1 s) to show the basic settings of the status
display.
7.6 Advanced operation
Switching the device on/off
‘Main menu è Device On/Off
1.
Press D, Ñ to select On or Off.
2. Press SET. Charging of the battery is switched on/off. OFF is
displayed in the basic setting of the status display when
charging is switched off.
756.404 | Z01 | 16.06
56