Installation Guide
Rev1/2015 
8 | P a g e  
INSTALL THE GASKETS 
1.  Once all is connected, place the wooden shower grid floors 
and benches inside the unit. 
2.  Please, do not use the unit for at least 24hours or until the 
silicone is completely dried. 
________________________________________________________________________________________________ 
HANDLE ASSEMBLY 
TRIM FLANGE ATTACHMENT 
Position  Flange  (A)  on  the  Valve  (B)  with  drain  hole  (C) at  the 
bottom.    Place  Protective  Washer  (D)  on  the  short  end  of  the 
reversible Retainer Sleeve (E).  Screw Retainer Sleeve (E) onto 
threaded section of the Stem and Bonnet (G).  Tighten Retainer 
Sleeve  (E)  by  hand  until  Flange  (A)  is  snug  to  finished  wall 
surface.  If the short end of the Retainer Sleeve (E) is too short, 
reverse it to use the longer end. 
HANDLE ATTACHMENT 
Screw Stem Extender (A) onto the Valve Stem (B). Thread the 
Set Screw (C) into the Handle and thread it in only three or four 
turns. With valve in CLOSED position, place handle (D) onto the 
Steam Extender (A) and tighten the Set Screw (C) by using the 
Hex Wrench (E) that is provided. 
Make sure Set Screw (C) is securely tighten to handle (D). 










