Installation Guide
6 
INSTALLATION INSTRUCTIONS 
Note: Confirm the drain setup. When installing, make sure each panel is level, plump & 90-degree before securing completely. 
1.  Place shower tray in the corner where it will be 
permanently located. Note: The handing (R/L) of your unit 
determines which side the 5in mounting plate/shelf goes 
2.  Determine placement of Steam Generator, water and 
electric supply.  
3.  In the parts box is a roll of a foam type tape with one side 
that has an adhesive on it. This should be placed in the 
bottom channels of the base where the glass panels rest. 
4.  Make sure the installation holes for the electric parts and 
the steam generator are lined up with installation holes; 
connect it with Hex bolts. Base must be set in Thinset 
or other support material. 
5.  Install the corner gaskets on left side of the large solid 
panel B and trim, then install the angle bracket to the 
holes on glass B (black back panel). Connect with screw. 
Note: On panel B there is a “notch” on the bottom. It is 
imperative the notch be moved as far as the base will 
allow; this should give you an overhang of the side panel 
over the base about 1/8 to 3/16 in. If you do not have the 
glass positioned with the overhang there will not be 
enough space between the door and the side panel to 
enable the magnetic strips to make proper contact. 
6.  Insert the half-moon shaped rubber seals on both sides 
(outside facing edge), and top edge of glass A. Note: top 
gasket may be already installed on the control panel. 
7.  Install angle brackets over the installation holes of glass A, 
connect with connector bolts (make the connection snug, but 
loose enough to make adjustments.) 
8.  Place bottom edge of glass A into the slot on the base as 
shown. A small amount of soap or lubricant on the gaskets 
will help with installation. 










