Installation Guide
8 
labeled steam generator drain, the second end is connected to 
the small plastic stub sticking out the glass panel right below 
the steam line connection and the third and last connection of 
the hose goes the 90 degree barbed fitting about 6 inches 
below the steam outlet. 
16.  Attach glass panel E which has a black stripe across the top 
and side to glass panel D and A. Note: On the front panel E 
there is a “notch” on the bottom. It is imperative the notch be 
moved as far as the base will allow; this should give you an 
overhang of the side panel over the base about 1/8 to 3/16 in. 
If you do not have the glass positioned with the overhang there 
will not be enough space between the door and the side panel 
to enable the magnetic strips to make proper contact. 
17.  Insert the corner seal and corner brackets on the left side of 
glass F (will have holes for door hinge) attach to panel D & C 
with angle brackets and connector bolts. Attach door hinges 
and door Panel G. 
Note: Read the Door Installation Help on page 9. 
18.  Put the wood floor grids in the shower tray and benches in the 
unit. Attach flexible waterline to outlet on panel A and the other 
end to the handheld shower wand. Attach to the bracket. Note: 
the hex nut of the water line goes on the panel outlet. 
19.  Attach handle to the door and shelves to panels B and C. 
20.  This gasket must go between the magnetic gasket and the 
bubble gasket on the hinge side. The magnetic gasket 
and bubble gasket must extent down to almost touching 
the base top otherwise there could be some leaking. 
21.  Steam Cup Connection Diagram 
A: Steam outlet 
B: Steam line 
Connector 
C: Glass 
D: Steam hose 










