Installation Guide
6 
INSTALLATION INSTRUCTIONS 
Note: Confirm the drain setup. When installing, make sure each panel is level, plump & 90-degree before securing completely. 
1.  Place shower tray in the corner where it will be permanently 
located. Note: The handing (R/L) of your unit determines which 
side the 5in mounting plate/shelf goes (ie: A right handed unit 
has the mounting plate/shelf on the right side). 
2.  Determine placement of Steam Generator, water and electric 
supply. 
3.  In the parts box is a roll of a foam type tape with one side that 
has an adhesive on it. This should be placed in the bottom 
channels of the base where the glass panels rest. 
4.  Make sure the installation holes for the electric parts and the 
steam generator are lined up with installation holes; connect it 
with Hex bolts. Base must be set in Thinset or other 
support material. 
5.  Install the corner gaskets on left and right sides of the large 
back panel B and trim, then install the angle bracket to the 
holes on glass B (black back panel). Connect with screw. Note: 
Attach glass shelf brackets to back of panel B before 
proceeding. 
6.  Install angle brackets to the glass panel (C). Install the angle 
bracket to the holes on glass, panel C. Refer to picture below. 
Note: Attach glass shelf brackets to back of panel C before 
proceeding. 
7.  Place glass C into the slot onto the base and insert into the 
corner seal of glass B. Note: Glass B is the large black panel, 
and glass C is a black side panel. Line up the installation 
holes and connect glass B and glass C. Note: Use Windex for 
lubricant. 
8.  Insert the half-moon shaped rubber seals onto the right side 
(outside facing edge), and top edge of glass A. Note: top 
gasket may be already installed on the panel.  










