Installation Guide
2 pg 
Critical updates 
These are important updates for optimum performance of the Encore generator 
When connecting the keypad to the power box and the generator for the first time, it is critical that the keypad and the 
generator are set to the same temperature scale setting I.E. Celsius or Fahrenheit. To do so make sure everything is 
connected and powered up. The generator does not have to be on and running. Rotate the dial until the last icon on the 
right is highlighted. Press and hold the dial in until the setting changes from Celsius to Fahrenheit or vice versa. Release 
the dial. This syncs the temperature scale setting between the keypad and the steam generator. You can then press and 
hold the dial in until the desired scale is reached. 
The keypad needs to be set properly to regulate the temperature of the steam room. The steam generator does not 
need to be running for this operation. Rotate the dial until the thermometer is highlighted, seventh icon from the left. 
Press the dial and hold it in, the temperature setting for the steam room will be displayed and will be flashing, continue 
holding in the dial until you see IN flashing in the display. If the display reads a flashing IN, release the dial and the 
setting is correct. If it displays a flashing OUT, continue to press and hold the dial in until the display changes to a 
flashing IN, release the dial and the key pad is set to the proper function. 
Installation update Bulletin 
Installation of 9KW and 12KW steam generators.  
When connecting the power supply for the 9KW and 12KW steam generators, there may be some difficulty connecting 
the 8- & 6-gauge wires into the terminal block.  In order to make these connections as easy as possible, you can remove 
steam generators wires from the terminal block and wire nut the wires directly to your power source. This will make the 
electrical connections easier. 
Installation of 6KW 
When using the connection terminal block, the connection can become loose due to expansion and contraction from the 
heat and the small vibrations caused when the unit is running. After the initial installation the connection must be 
checked after 30 days to make sure the connection is still tight (tighten if necessary), then the connection should be 
checked about every 6 months after that. 
 If desired connections may be made directly not using the terminal block. Follow the instructions above for the 9KW 
and 12KW steam generators 
.   
 Terminal block connected  Terminal block by-passed using wire nuts 
  THIS WILL NOT VOID THE WARRANTY 










