User's Manual
UM000004-1_3 - Micro.sp (Q)Be
©
Station System v4 User Manual
23
Ste Industries
Via privata Oslavia 17/8D – 20134 Milano
www.ste-industries.com – info@ste-industries.com
Figure 17 – GSM Test failed
2.1.13 Fixing Tower bracket
After the system has been configured and tested, please follow the steps below:
1. Close the mother board box carefully, avoiding to crush cables
2. Screw the four screws
3. Close the lateral apertures of the plastic box
4. Fasten (Q)Be© towers to the ground with four fixing bolts (included in the
installation content). Use a hexagonal spanner of the appropriate diameter and fix
firmly the towers to the concrete floor.
2.1.14 Re-installing (Q)Be
©
plastic cover
To complete the installation, re-install (Q)Be© plastic cover on top of the metal bracket.
Caution: When placing the plastic cover on top of (Q)Be© metal
bracket, do not damage the antennas located on the upper rack.
Insert the plastic cover carefully and in the right direction (so that there shall be two holes on
the right side and one on the left side), then screw the hexagonal screws. Do not overtighten,
otherwise the plastic cover may break.










