Use and Care Manual
www.stcny.com
14 / 44
2.9
!
Y32
Y31
G02B
G02A
G06A
G06B
P05
P01
P01
P04
G01M
G01N
G01Q
P05
P01
G06A
G02A
G01N
Repeat steps 2.8A through 2.9 to t the
bottom proles to the back of the greenhouse.
x2
way into place, carefully line up P01 connectors with
G06B and G06A and P04 and P05 connectors with
into V-channels. Snap connectors
P01, P04 and P05 securely
NOTE: ALL VIEWS ARE FROM INSIDE.
Connectors P01, P04 and P05 CLICK into place.










