User Manual

INSTALLATION PREPARATION
New Construction
Episode
®
speaker installations can be simplied by using Episode
®
new construction brackets (sold
separately). These are installed prior to drywall, and allow for precise placement to ease the nal installation of
the speaker.
EXISTING CONSTRUCTION
1. Choose a location for each speaker that is free of obstructions created by joists, HVAC ductwork, electrical
wire runs, plumbing or anything else that might not allow for the depth of the speaker or create interference
or noise.
2. Once you have determined your locations, mark the hole to cut out for the speaker using the supplied
template. Don’t forget to allow for the size of the speaker bezel if you are choosing to install the speaker
near a side wall or other item that could become an obstacle.
3. If you are unsure of potential obstacles, carefully cut your holes using an angle to the inside of the
cutout area as illustrated. This will allow you to ‘plug’ the hole easily if needed. If the area is clear and a
good location for the speaker, cut the edges of the opening at 90 degrees to accommodate the speaker
diameter.
PG.2