STAT SIGNAL PN# 100174-xx CENTURION Meter Interface Final Assembly Procedures Document 8000174-60-01 Submitted: August 27, 2002 Confidential Document This is a confidential document which is owned and Copyrighted by Statistical Systems, Inc., which reserves all its rights. This document may be reproduced only with the express written permission of Stat Signal. Systems, Inc. © Copyright 2002.
Final Assembly Procedures Document 8000174-60-01 100174 Centurion Meter August 27, 2002 Page i Revisions 1. Initial Draft ~ July 22, 2002 2. Release Version 00 ~July 24, 2002 3. Released Version 01 (for Production) August 27, 2002 © Copyright 2002, Stat Signal Systems, Inc.
Final Assembly Procedures Document 8000174-60-01 100174 Centurion Meter August 27, 2002 Page ii SIGN OFF PAGE Lead Engineer: Executive Vice President: Print Name: Print Name: Signature: Signature: Date: Date: Production Manager: Print Name: Signature: Date: © Copyright 2002, Stat Signal Systems, lnc.
Final Assembly Procedures Document 8000174-60-01 100174 Centurion Meter August 27, 2002 Page iii Table of Contents Confidential DOCUMENT « «vv avr veers train aueaesaesasonsssaonnorserssissy 1. BOO Ls iti cer ceca tear aaa aes aa 2 REFERENCES + itt i titties tie ree aarianaesasrasraesasranvasen 2 FCC STATEMENT «Lott t tiara raiser ser arias cas coscasasnoannnennsa 3. SAFETY PRECAUTIONS LL tir rite iis coat itranvancanenoonaonesans 4. MATERIALS AND TOOLS REQUIRED ci 4.
Final Assembly Procedures Document 8000174-60-01 100174 Centurion Meter August 27, 2002 Page 1 1. SCOPE This document provides the procedures required to safely and efficiently install the 200174 Centurion Meter Interface into the 100174 Schlesinger Centurion Meter. 2. REFERENCES a) AC RMP connector b) CONCENTRIC 100174-Build Book CD 3. FCC STATEMENT This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules.
Final Assembly Procedures Document 8000174-60-01 100174 Centurion Meter August 27, 2002 Page 2 aj 1 Each AC Kilowatt Meter (110174) b) 1 Each CENTURION Meter Interface Circuit Board Assembly (200174} <} 1 Each AMP connector, used between petrology and OEM module (640122) od} 1 Bach AC Meter plastic internal cover (1101741) e) 1 Each Poly carbonate cover (110174-2) f) 1 Bach Meter Base Housing ag) 1 Each LCD Glass (512834) h) 1 Each LCD Bezel (512832) i) 1 Each Elastoplast (512833) 1) 1 Each Stat Signal seri
Final Assembly Procedures 100174 Centurion Meter 6.2 Document 8000174-60-01 August 27, 2002 Page 3 CENTURION Meter Interface (200174) Installation al £) Remove one meter Circuit Board Assembly (200174) from the package/assembly line and write down/scan into a table the serial number of the circuit board assembly 200174 next to the meter serial number which can also be scanned. Press side tabs of internal cover (11074-1) and apply pressure until the cover can be removed.
Final Assembly Procedures Document 8000174-60-01 100174 Centurion Meter August 27, 2002 Page 4 cover (999100). x3 Apply FCC identification label to side of cover (9389174). © Copyright 2002, Signal Sterns, Ine.
Final Assembly Procedures Document 8000174-60-01 100174 Centurion Meter August 27, 2002 Page 5 Figure 6-1 2000174 CENTURION Meter Interface Installation CD Incise LOD Beat 12832) Astronomer (592083) wee. LOD Burl Hooks Mounting Brackets. Hetero Base nous — (110174120260) AMP Concetta (64022) * AX ATONE* kk * CENTURION Meter Interface 200174 Circuit Board Assembly is installed on the 110174 CENTURION Meter Base with the components facing inward to the Meter.
Final Assembly Procedures Document 8000174-60-01 100174 Centurion Meter August 27, 2002 Page 6 Assembly components. Inspect to make sure the board labels are in place Reinstall the glass/plastic (110174-1) cover to the Electric Meter Base housing. Install the Tamper Seal (998110) to the Meter Base Housing to complete the 100174 meter. @ Copyright 2002, Stat Signal Systems, Inc.