- Instruction Manual Residential Gas Water Heater

21
INSTALLATION SEQUENCE
ForinstallationsintheCityofLosAngeles,CaliforniaCategoryIV
PVCPipesuchasthatmanufacturedbyBrownlinePipeCompany,
mustbeusedasventpipematerial.
CAUTION
VENT TERMINALS SUPPLIED WITH HEATER MUST BE USED.
NOTE: BEFORE BEGINNING INSTALLATION OF ANY
VENT PIPE READ THE VENT PIPE MANUFACTURER’S
INSTALLATION INSTRUCTIONS.
1. After the points of termination have been determined,
use the cover plates as templates to mark the holes for
thevent pipes tobe inserted throughthewall.BEWAREOF
CONCEALED WIRING AND PIPING INSIDE OF WALL. If the
ventterminalsarebeinginstalledontheoutsideofanished
wall, it may be easier to mark both the inside and outside
wall.Aligntheholesbydrillingaholethroughthecenterofthe
templatefromtheinsidethroughtotheoutside.Thetemplate
cannowbepositionedontheoutsidewallusingthedrilledholes
asacenteringpointforthetemplate.
A.) MASONRY SIDE WALLS Chisel an opening approximately
1/2”(1.3cm)largerthanthemarkedcircle.
B.) WOODENSIDEWALLSDrillapilotholeapproximately
one quarter inch outside of the marked circle. This
pilot hole is used as a starting point fora saws-all or
sabresawblade.Cutaroundthemarkedcirclestaying
approximately one quarter inch outside of the line.
(This will allow the vent pipe to easily slide through
the opening.The resulting gap will be covered by the
vent terminal cover plates.) Repeat this step on the
inside wall if necessary.
2. Cutalengthof3”PVCpipeabout3.5”(8.9cm)longerthanthe
wallthicknessattheopening.
3. Gluetheintakeventterminaltothesectionofthepipe.
4. Slidethewallplateoverpipetostopagainstintakeventterminal.
5. Placeabeadofcaulking(notsupplied)aroundthegapbetween
the pipe and the wall. Place some of the caulking on the
backoftheplatetoholditagainstthewallafterinstallation.
6. Iftheventpipeisinstalleduptothewall,withacouplingonthe
endagainstthewallopening,thepipewiththeventterminalcan
bepreparedforgluingbeforeinsertingthroughthewall.Slidethe
pipethroughthewallandinsertintocouplingontheothersideof
thewall,makingsurethattheventterminalendsuppointedinthe
correctposition(Figure19).
FIGURE 19.
VERTICAL VENT TERMINAL INSTALLATION
IMPORTANT
WHEN TERMINATING THROUGH A ROOF, THE FOLLOWING
SPECIFICATIONS PERTAINING TO TERMINAL LOCATION
MUST BE FOLLOWED.
1. Propersupportmustbeprovidedforallpipeprotrudingthrough
the roof.
2. Theverticalroofterminationsshouldbesealedwithaplumbing
roofbootorequivalentashing.
3. Theintakeventterminationandtheexhaustventterminationmust
penetratethesamesideofroof.
4. Thecenterlineoftheintakeventterminationandthecenter
line of the exhaust vent termination must be no closer
than24”(61cm).
5. Theintakeventterminalandtheexhaustventterminalmustbe
orientedfacingdownwardandthesamedirection.
ThespecicationsaredisplayedinFigures20&21.
NOTE: Exhaust vent terminal is installed using the same
procedure.
FIGURE 20.
FIGURE 21.