User Manual
24
To view manuals, videos, drivers, downloads, technical drawings, and more visit www.startech.com/support
16. Route the Cables connected to the Projector (e.g. Power
Cable, etc.), though the bottom end of the Lower Pole with
Cable Notch and out through the top.
Routing the Projector Power Cable
17. Attach the bottom of the Lower Pole (with Cable Notch)
to the top of the Ball-Joint Mechanism. Make sure that the
Mounting Holes on the Lower Pole are aligned with the
Mounting Holes on the Ball-Joint Mechanism.
Note: Route the Projector’s Power Cable through the
Cable Notch in the Lower Pole before inserting the M6 x
12 mm Screws.
18. Insert a M6 x 12 mm Screw (x 3) through each of the
Mounting Holes on the Lower Pole and into the Mounting
Holes on the Ball-Joint Mechanism.
19. Using the 5 mm Hex Key tighten the M6 x 12 mm Screws.