Installation Guide

750 TAPERED SHIM,
INSTALLATION GUIDE
Required Tools: 750 Tapered Shim, Panel Adhesive,
Drill, Screws
After laying out your furring horizontally, start the
installation of the furring systems by nailing the furring
straight into position, without panel adhesive. This allows
the furring to be adjusted in and out.
750 Tapered Shims can be used for any item that
needs variable spacers. They are especially useful
for shimming furring.
Use a level, shims and glue to screw and lock the far left
and right sides of the furring into place. This provides level
work surfaces to straighten the middle of the furring.
Determine greatest projection (bump out in wall).
This will determine the face of your furring and panels.
It is important to know exactly where you want your
face of furring before you start.
Place a ¾” thick blocks on the far left and right sides
of the furring that are fixed and leveled. Pull a tight
string line between the blocks.
GET TOOLS READY
3 4
5 6
1 2
“Hidden Fastener Specialists” | www.starhanger.com
60

Summary of content (2 pages)