Installation Guide
Determine panel widths based on horizontal lines and field
alignment requirements.
Field verify all required site dimensions based on face of
panels for both field horizontal & vertical lines.
7 8
Starting installation; re-verify all required site dimensions
based on field horizontal & vertical level lines.
Start the installation of the furring systems, other
Star Hanger Installation Guides may be helpful here.
Revise elevations on the shop drawing based on panel
heights horizontal & vertical level lines & end conditions.
Determine face of all panel sizes on primary drawing layer.
9 10
11
DETAIL: GREEN GLIDE WALL END
SCALE: 6" =1'
B
5
16
" HANGER SCREW
STAR GREEN GLIDE
FINISHED PANEL
GWBD
REVEAL
1
8
" SHIM
REVEAL
1
3
4
"
1
3
4
"
1
2
"
1
1
4
"
1
3
4
"
SECTION: WALL
SCALE: 1" =1'
H
OPEN
ELEVATION
SCALE: 1" =1'
SECTION: WALL
SCALE: 1" =1'
1
H
01 02 03 04 05
10
11
16
17
06
12
14 15
18
SECTION: WALL
SCALE: 1" =1'
I
08 0907
13
HIGH POINT
Star Hanger Systems
Architectural Wood Work Elevations & Details
ENGINEERED FURRING
CONNECTS TO: Wood
REVEALS: Laminate
INSERTION: Dead Blow
REMOVAL: Vacuum Cup
5