User's Manual
24
Install Portal Gateways (Task 8)
The most common installation site is inside an existing protected area such as a
locked room or other secure enclosure, or above ceiling level. If you are installing
inside a dealer-supplied locked enclosure, refer to the instructions provided with
that equipment. Figure 6 shows a Portal Gateway positioned in a protected area.
Figure 6 Installing a Portal Gateway in a protected area.
Connecting the Portal Gateway and Verifying Operation
Once the Portal Gateway is installed, connect and verify operation:
1 Connect the power supply to the Portal Gateway and plug the transformer into
a dedicated AC power supply (wall outlet). The Power Indicator light should
come on. See Figure 7.
Approx.
5 ft. 6-in. high
(eye level)
Portal
Gateway