Installation Instructions

16
2. I
nstall a second layer of twelve inch (12") by twelve inch
(12") Tape Flashing over the rst, but reverse the process by
installing the nine inch (9") half overlapping the previously
installed three inch (3") piece. See Figure 13B. This patch
should extend onto the roof surface a minimum of four inches
(4") and up the vertical a minimum of eight inches (8").
COVER STRIP
Where a protrusion in the roof, such as a pipe or curb opening,
was encountered while installing the RoofKit Rubber Roong
Membrane; the membrane was cut to the nearest edge to allow
easy layout of the membrane. After the eld membrane has
been glued and broomed into place; apply Seam Primer to all
areas to be covered using a scrub pad and allow to dry. After the
Primer has dried, install the Cover Strip over the entire cut in
the eld membrane from the pipe to the end of the membrane,
prior to Pipe Boot installation. See Figure 14.
Rubber
Caulk