Installation Instructions

7
INSTALLATION
Unroll the RoofKit White Reinforced Membrane over the
substrate so that the sheet is in the desired position and is
wrinkle free. If more than one roll of membrane is required,
subsequent rolls must over lap the prior roll a minimum of
three inches (3") for seaming. Start at the low side of roof if
seaming rolls. Care should be taken to ensure the membrane
overhangs the perimeter of the roof at least three inches (3").
Allow the RoofKit White Reinforced Membrane to relax
for approximately 25 minutes depending upon weather
conditions.
Fold the membrane onto itself so that one-half (1/2) of the
underside of the membrane is exposed. Take care to avoid
wrinkles.
White Membrane Water Based
Bonding Adhesive: (Plastic Container)
(May be applied in one of two methods)
One-Sided Application Method for Field of Roof: Open and
thoroughly stir the Water Based Bonding Adhesive. Using a
3/4 “large nap paint roller, apply the Water Based Bonding
Adhesive to the substrate at a rate of 100 square feet per gal-
lon. Then carefully fluff air under the top half of the membrane
and roll the membrane into the wet adhesive starting from the
middle of the membrane first, followed by the ends. DO NOT
let the ends of the membrane roll ahead of the middle. Lightly
broom the membrane to remove any air pockets or wrinkles
and to ensure transfer of adhesive to the bottom side of the
membrane. Caution: limit foot traffic on the membrane while
FIGURE 1 - Fastening Pattern