Installation Instructions
10
TERMINATION BAR
When using the Termination Bar to secure the White Reinforced
Membrane over the edge of the roof, make sure that the sheet
extends a minimum three inches over the roof’s edge. Center
the bar in the 3” overhang and secure with fastening screws.
The screws should be positioned through the pre-drilled holes
along the length of the Termination Bar. Use a utility knife, to
trim any excess membrane below the bar for a finished look.
When using the Termination Bar to secure membrane that has
been placed up a wall, the Bar will be positioned a minimum
of 12” from the wall base. The membrane should have, at this
point, been adhered to the wall using the appropriate RoofKit
adhesive. Peel back the top of the glued membrane from the
wall and apply a heavy bead of RoofKit Water Stop caulk
between the membrane and the wall. The RoofKit Water
Stop caulk should be applied so that the final position of the
Termination Bar will be directly over the Water Stop (see fig.
WRK202, pg. 24). The Bar should be secured with proper
fasteners, depending on the substrate. Using a utility knife,
trim the excess membrane just above the Termination Bar.
Finish the termination by sealing the top edge of the membrane
using RoofKit White Membrane Caulk.
When using wood shakes or other siding materials, the
Termination Bar is not required if the siding material is
brought down at least eight inches (8”) beyond the top of the
RoofKit White Roofing Membrane. All siding must be kept a
minimum of 4” above the roof deck.
OUTSIDE CORNER DETAIL
Using scrub pad, clean entire
area with Roof Kit Seam
Primer. Allow to dry.
Fold 8" round corner in half,
remove top half of paper
backing and position ½ of each
top fold onto the outside corner.
Step 1
Step 2