Installation Instructions

10
3. Install 6" Reinforced Strip to the substrate with Fastening
Screws and Plates every twelve inches (12"). Ensure that the
6" Reinforced Strip is butted to the curb detail. Clean and
prime all membrane surfaces, including the 6" Reinforced
Strip, and allow to dry.
4. Roll the membrane around the curb, leaving a triangle of
membrane, and turning the membrane up on all four (4)
sides. Using scissors cut a round hole at every angle change
of the membrane at the outside corners (This will prevent
the cut in the membrane from continuing.)
5. After all cuts are made and the membrane has been correctly
positioned, fold the membrane back and begin bonding
procedure. Apply Multi-Purpose Bonding Adhesive to the
6" Reinforced Strip, folded membrane, and the curb area.
6. Starting at the base or angle change, roll the membrane up
the curb (chimney, skylight, etc). Take care to thoroughly
adhere the membrane into the angle change before rolling
the membrane up the curb. Roll the at surface of the 6"
Reinforced Strip with a steel or hard rubber roller. Broom or
hand rub the membrane to ensure 100% adhesion.
see detail illustration #RK202, page 33 for more detail