Product Description
eng
Power cable
Ethernet cable
Product label
Product label
Resetting
Reset the gateway to avoid abnormal behavior
by removing the power supply for a few minutes
before reapplying it. In case the gateway does
not start up, follow the steps below to reset the
gateway to the factory setting.
STEPS FOR RESETTING
1. Use a pen and hold down the reset button
as indicated in the picture.
Disposal
• Dispose the product properly at the end of
life. This is electronic waste which should be
recycled.
• This gateway optionally includes a Lithium
battery. Please dispose of the battery
according to your local regulations.
2. Release the pen again when the LED on the
front panel starts to ash continuously.
3. The system will reboot and after a few
minutes the application will be started again.
Getting started
1. Connect the power cable to the gateway.
2. Connect the power adapter to a wall socket.
3. Connect an Ethernet cable from the
gateway to an internet-connected home
router.
4. The LEDs on the front panel are turned on
when the system is booting.
5. The LEDs in the Ethernet connector
are turned on and the green LED starts
ashing indicating data communication.
6. After a few minutes, the application is
started and the system is ready for use.
• Do not remove the product label as it
contains important information.
Product description
This all-in-one gateway connects smart devices
and provides you with monitoring and control
functionalities via your smart system. As the
gateway is simple to install, you can quickly
start to use your smart system and enjoy the
connected life.
Version 1.5
INSTALLATION MANUAL
MGW211 and MGW221
Squid.link 2B/2X
Precautions
a.
b.
c.
Insert sim card
If you have a single sim card and no battery
backup:
• Simple insert the sim card into the card slot
on the bottom of the gateway.
If you have dual sim and/or battery backup:
1. Open the battery compartment of the
gateway with a screwdriver.
Battery replacement
If your gateway includes a battery backup, you
can replace the battery in the following way.
CAUTION: RISK OF EXPLOSION IF BATTERIES
ARE REPLACED BY AN INCORRECT
TYPE. DISPOSE OF THE BATTERIES IN
ACCORDANCE WITH INSTRUCTIONS.
CAUTION: When removing cover for battery
change - Electrostatic Discharge (ESD) can
harm electronic components inside
1. Open the battery compartment of the
gateway with a screwdriver.
2. Remove the battery from its place within
the compartment.
3. Disconnect the battery and connect the
new one. The gateway uses a Li Pol (3,8 V /
2000 mA) battery.
2. Remove the battery from the
compartment. It is not necessary to
disconnect the battery for this.
3. Insert one or two sim cards into the card
slots. If you have only one sim card, insert
it into the slot marked as 1.
4. Put the battery back into its place.
5. Close the battery compartment and
reattach the screw to fasten it.
d.
1
2
e.
4. Insert the new battery in its space in the
compartment and tuck the cables over or
under the battery.
1
2
f.
5. Close the battery compartment and
reattach the screw to fasten it.
g.
1
2
Other certications
• Zigbee 3.0 certied.
CE certication
The CE mark axed to th is product conrms
its compliance with the European Directives
which apply to the product and, in particular, its
compliance with the harmonized standards and
specifications.
To comply with RF exposure requirements, a
minimum separation distance of 30cm must be
maintained between the user’s body and the handset,
including the antenna.
the radio equipment type [MGW211/MGW221] is in
compliance with Directive 2014/53/EU. The full text of
the EU declaration of conformity is available at the
Official Website.
IN ACCORDANCE WITH THE DIRECTIVES
•
Radio Equipment Directive (RED)
2014/53/EU
• EMC Directive 2014/30/EU
• RoHS Directive 2015/863/EU amending
2011/65/EU


